ANGOLA IV PLANT — AUTOCAD CONVERSION REV02

PRIMARY FILE
- Angola_IV_Plant_Cleanroom_Personnel_Material_Flow_REV02.dxf
- AutoCAD-compatible DXF, model space 1:1, units millimetres.
- Source vector geometry calibrated against the drawing's 97,500 x 40,000 mm overall dimensions.

REV02 GMP CONTENT
- Revised personnel-entry sequence: CNC -> Grade D -> Grade C -> Grade B -> G07.
- Five proposed 900 mm-clear personnel doors with swing arcs and interlock notes.
- Sealed flush vision-panel locations at PAL transitions.
- Sterile-garment pass-through from S01-B to final Grade B gowning.
- Proposed Grade D G02 dispensing suite at the W01/G09 interface.
- Two proposed 1,400 mm-clear raw-material doors and W01 -> G02 -> AL01/MAL -> G09 route.
- Controlled reverse de-gowning is shown as time-separated; a dedicated exit PAL remains a DQ decision.

LAYERS
The editable DXF contains source-color layers plus separate proposed-wall, door, vision-panel, room-grade, personnel-flow, material-flow and revision-note layers.

VALIDATION
- 28,748 model-space entities.
- 0 DXF audit errors.
- 0 DXF audit fixes.
- Full-plan render and enlarged door-detail render visually checked.

DWG STATUS
A local LibreDWG conversion was attempted but failed the mandatory entity round-trip validation, so the unverified DWG was withheld. Open the supplied DXF directly in AutoCAD and use SAVEAS to produce a native DWG. This protects the drawing from an empty/corrupt DWG conversion.

ENGINEERING STATUS
Concept/DQ revision only — not for construction. Final issue requires confirmation of personnel count, door fire/egress strategy, interlock cause-and-effect, pressure cascade, room data sheets, equipment/cart envelopes, and dedicated Grade B exit/de-gowning strategy.

Prepared by Hamza Ahmed
Vice President — Engineering & Business Development
Business Tacts International
